Choose Kitchen Appliances Before You Order Cabinets

A refrigerator can fit the space on a drawing and still be impossible to use. The door may hit a wall, the drawer may not pull out, or a plug behind the unit may push it past the cabinet fronts. A kitchen appliance is a moving object with connections and service needs, not just a rectangle on a floor plan. Settle those details before the cabinet order goes in.

You do not have to take delivery early. Pick the models early enough to coordinate the room, then agree on when to order, receive and install them.

Start with exact model numbers

Make one list for the range or cooktop, ovens, hood, refrigerator, dishwasher, microwave and anything built into a cabinet. For each item, save the model number and the current installation instructions. A showroom brochure or online product tile is handy for comparing finishes, but it is not the document the cabinet shop and trades should work from.

Send the same list to the designer, cabinet supplier, contractor and appliance seller. Mark every item as selected, backup or still open. If an appliance is backordered, do not let a substitute slip in by text or phone without checking its cutout, clearances and utilities. Two units sold as the same nominal width can still require different openings or connection locations. GE Appliances’ clearance guidance is a good example of why the instructions for the specific model control the planning details.

Get beyond the width of the opening

Check each appliance in three positions: installed, fully open and pulled out for service. For a refrigerator next to a return wall, put the handle and door swing on the drawing. Check whether the door can open far enough to remove the bins. For a dishwasher on a corner, open the neighboring drawer on paper at the same time. For a wall oven, check the open door, nearby landing space and whether someone can safely stand in front of it without blocking a tight passage.

Panel-ready appliances add a second set of decisions. Confirm who supplies the decorative panel, who drills it, how the handle is mounted and whether the appliance maker sets a panel size or weight limit. On the cabinet elevations, show where fillers, end panels and toe kicks end so each trade sees the same finished condition.

Draw the utilities, not just the cabinets

Ask the electrician, plumber and mechanical installer to review connection locations before rough-in. Depending on the model and design, the room may need new wiring, an accessible water shutoff, a different supply location or a rerouted duct. Switching from gas to induction, for example, is a reason to have the electrician check the proposed circuit and available capacity before assuming the old location works. The reverse switch is not just an appliance swap either. Leave verification of supply, equipment and permitted work to the relevant trades.

Plan the hood while the layout is still flexible. Trace a duct route on the drawing and check what it passes through: cabinets, framing, an upper floor or an exterior wall. Confirm the appliance and hood combinations with the installers and ask whether outdoor exhaust or replacement air changes the plan. These details can affect both scope and cabinet storage.

For projects within Tacoma, start with the City of Tacoma’s residential permits guidance. For an unincorporated Pierce County address, check the Pierce County Development Center. A Tacoma mailing address does not by itself tell you who issues every permit. Identify the building and trade authorities for your address and describe the actual work.

Assign delivery and installation separately

Write down who orders, receives, inspects, stores and installs each item. Confirm what the retailer means by installation. A delivery crew may handle a standard connection but not cabinet alterations, a new shutoff or a duct change. The contractor can plan for any work that the retailer excludes, and you will know who to call if a part is missing.

Check the route from truck to kitchen, including porch steps, turns and the narrowest doorway. Confirm when damage must be reported and who will photograph and report it. If you want to buy during a sale, compare the savings with the storage and return risks. An unopened box is not proof that the unit is undamaged or that the model matches the order.

Make one last check before release

Ask for the cabinet drawing and appliance list together. Check the exact models, finished opening dimensions, door and handle swings, utility locations, duct route, owner-supplied parts and installation responsibilities. If one choice must stay open, mark which cabinets or connections cannot be finalized until it is decided. That is better than treating an unresolved item as a field adjustment.

Planning a kitchen remodel in the South Sound? Bring your rough layout and appliance shortlist to Broussard Construction. Call 360-509-0280 or email phillip@broussard-homes.com. Washington contractor registration: BROUSHS858KO.

Share Article

Our Recent Articles

Choose Kitchen Appliances Before You Order Cabinets

A refrigerator can fit the space on a drawing and still be impossible to use. The door may hit a wall, the drawer may not pull out, or a plug behind the unit may push it past the cabinet fronts. A kitchen appliance is a moving object with connections and

A Preconstruction Selections Checklist for Your Remodel

A saved photo can explain the look you like. It usually cannot tell the person ordering materials which model, size, finish, or accessory belongs in your house. Before construction, turn those visual ideas into a selections sheet that connects each choice to a room, a product, and an approval. This

Home Addition or Remodel Within Your Existing Footprint

When a house feels cramped, an addition is an understandable first idea. But extra square footage may not be the only way to solve the problem. A room used mainly for storage, an awkward circulation path, or two spaces doing the same job may offer another starting point. The useful

Frequently Asked Questions

The initial site visit and estimate are free!

Financing is available through Service Finance Company, LLC, a third-party lender. Financing is subject to credit approval and lender terms.

Each project will have a payment schedule that will coincide with specific project milestones. Payment schedules are broken down into three payments; deposit, progress payment, and final. For projects under $2,000, the payment will be collected in full after the project has been completed. We accept checks, cashier checks, and all major credit/debit cards.

Yes! Contact us to learn more.